Automation of controlling processes with Power BI

Development of a controlling tool for monthly KPI reporting.

Industry

Plant & mechanical engineering

Country

Germany

Number of employees

0

Project results:

Project Objectives

Before Walecon was hired, the data required for reporting was sent from the individual departments (Sales, Marketing, Purchasing and Operations) in Excel to the Controlling department, which analysed the data and summarised it in a PowerPoint presentation. This process was time-consuming and error-prone and needed to be automated.

Our Approach

The first step was to analyse all the data required for reporting. Where possible, links were created to primary systems (e.g. Salesforce). For the remaining data, customised templates were created, stored centrally and automatically imported into the report. Following the implementation of the new process, the client was supported through three further reporting cycles to identify errors and further simplify the process. Workshops were held to improve the reporting structures and implement intuitive visualisations according to best practice standards.

The following tools were used in this project:

Power BI
SQL Server

Project results

The workload for reporting was reduced from 4 days per month to 1 day. The full potential of Power BI's dynamic dashboards could be exploited, which was not possible with the static PowerPoint reports. Reports were made available to employees through MS Team, with access rights and visible information controlled by department and position.

Support with financial modelling, valuation, data analytics, Excel and Power BI.

Walecon e.U.
Gentzgasse 148/1/5
1180 Vienna
Austria

Follow us

Walecon is a co-signatory of